Monday, September 06, 2010 Login  

Enter Title

   Minimize

Commander 227.

  

as we found her in Milwaulkee.

    

    

 Removing rotten core around hatches, through deck fittings and life line stanchions. The forward hatch will be glassed over as we feel it wrecks the boats pretty lines. The Life lines, pushpit and pulpit will not be going back on to further clean up and simplify the boat.

    
The outboard well and aft lazerette will be glassed over as we are converting the boat from an outboard model to an electric inboard. An aperature will be cut into the keel and rudder to provide prop clearance, a stern tube and shaft log will be installed to carry the shaft and the electric motor assembly will be installed under the cockpit sole.

    
Building the motor assembly.

    
Stern tube and motor mounts installed.

    
Rudder ready to reinstall after being cut for prop clearance. Motor assembly installed.

    
    
Glass work and new interior bulkheads.

    
Grinding out the endless gel coat cracks.

    
    
Decks primed with high build primer, sanded out and painted with Awlgrip. Non-skid reapplied.
Freeboard sanded and primed ready for topcoat.

    
    Freeboard painted with Awlgrip Flag Blue.

     
Boat Bling... back from the chrome shop.

    

    

 

The Princess!


Shorewood Marina and Yacht Club
Gideon's Bay, Lake Minnetonka  -  952-474-0600  -  E-Mail  -  Contact Us
Privacy Statement    Terms Of Use    Copyright 2009 by Shorewood Yacht Club